The ANZ Centre, formerly known as the Robert Jones Tower and the Coopers & Lybrand Tower, has been one of Auckland’s premier office spaces since its completion in 1991. At the time of construction, mobile technology was in its infancy – 4G and 5G were still decades away. Fast forward to today, and mobile connectivity is an essential part of doing business.
The 42 floor building, 32 tenanted floors and a public carpark, faced significant connectivity challenges:
ANZ Centre’s property manager, CBRE, knew that tenants needed seamless, building-wide coverage to stay connected, safe, and productive.
With extensive experience working alongside New Zealand’s major mobile network operators, Kordia was enlisted by CBRE to design and deliver a bespoke Distributed Antenna System (DAS) that could bring reliable 4G and 5G connectivity to every corner of the building.
The solution included:
With the completion of the DAS, for the first time since its construction the ANZ Centre now enjoys full mobile coverage for all tenants and even inside lifts. Tenants and visitors alike benefit from seamless 4G and 5G connectivity, improving productivity, safety, and day-to-day convenience.
With Kordia’s ongoing monitoring and maintenance, the system continues to deliver reliable performance, ensuring the building remains one of Auckland’s most connected and attractive business hubs.